英语翻译Woolpert LLP,the City of Mason,the Mason Parks & Recreation Department,parks masterplan Steering Committee,athletics program representatives and residents are engaged in amaster planning process for seven new park properties and the Muddy

来源:学生作业学帮网 编辑:学帮网 时间:2024/04/29 03:40:13

英语翻译
Woolpert LLP,the City of Mason,the Mason Parks & Recreation Department,parks master
plan Steering Committee,athletics program representatives and residents are engaged in a
master planning process for seven new park properties and the Muddy Creek Greenway
Corridor for the City of Mason.The new park properties add 261 acres to the City’s current
park system of 242 acres and represent a significant expansion of park and recreation
facilities available to the community and athletics associations.Upon completion,the
proposed park improvements will result in greater distribution of park lands and facilities
within the City.The Muddy Creek Greenway Corridor is intended to create connectivity
between both existing and new parklands as access along the corridor is obtained and
development standards within the floodway are implemented.
The master planning process has assessed the strengths and needs of the existing park system,
and identified the opportunities and constraints associated with each new park property in the
context of the whole system.Meetings with both the Steering Committee and the general
public provided on-going input at both the program development and planning phase.The
Steering Committee is composed of members of the Park & Recreation Advisory Board and
representatives from the Parks & Recreation Department.
Two rounds of Community-wide park planning meetings were conducted in May,2004.The
Kickoff Workshop in early May solicited community input on strengths and needs of the park
system,and issues to be addressed through development of the new sites.A two-day
workshop,late in the month allowed citizens to review and comment on analysis of the sites
and opportunities and constraints to development.Participants identified and prioritized
programs and facilities for the parks and sketched plan concepts of their vision for each park.

伍尔珀特llp的,这个城市的梅森,梅森公园休闲处,公园硕士
计划督导委员会,体育节目的代表和居民进行了
总体规划编制过程中,为7个新的公园性质和泥泞的小河绿色通道
走廊,为城市的梅森.新园物业放入261英亩到城市的电流
公园系统有242英亩,是一个重大的扩展公园及康乐
设施提供给社区及田径协会.当工程完成后,
建议公园改善,将导致更大的分销园区土地和设施
内城.泥泞的河绿色走廊,是为了创造连通
双方现有和新的公园,作为获取沿走廊是获得
开发标准与行洪的贯彻落实.
总体规划的过程中评估的优势和需要,在现有的公园系统,
并确定了机遇和制约因素,与每一个新的公园地产在
语境的整个系统.会议既督导委员会和总
公众提供持续的投入,无论在程序开发和规划阶段.该
督导委员会成员组成的公园及康乐顾问委员会
来自公园及康乐部.
两轮全社区公园规划会议,进行了2004年5月.该
开球车间在5月上旬,征求社会意见优势和需要公园
制度,要解决的问题,通过开发一个新的网站.一项为期两日
车间,下旬,在一个月允许公民审查和评论分析的地盘
机遇和制约因素的发展.与会者确定和轻重缓急
节目及设施,为公园及勾画计划的概念,他们的视野,为每一个公园.

伍尔珀特LLP,市瓦工,瓦工公园&娱乐部门,公园掌握
掌舵委员会,体育计划的计划代表和居民从事A
掌握规划过程,因为7 新公园特性和泥泞的小溪格林韦
瓦工的城市的走廊。 新公园特性给城市电流添加261英亩
242英亩的公园系统和代表公园和娱乐的显著的扩大
设施对社区和体育协会可提供。 当完成时,
推荐公园为改进将导致公园土...

全部展开

伍尔珀特LLP,市瓦工,瓦工公园&娱乐部门,公园掌握
掌舵委员会,体育计划的计划代表和居民从事A
掌握规划过程,因为7 新公园特性和泥泞的小溪格林韦
瓦工的城市的走廊。 新公园特性给城市电流添加261英亩
242英亩的公园系统和代表公园和娱乐的显著的扩大
设施对社区和体育协会可提供。 当完成时,
推荐公园为改进将导致公园土地和设备的更大的分配
在城市内。 泥泞的格林韦走廊小溪计划建立连接性
在存在和新parklands之间沿着走廊的进入被获得和
在floodway内的发展标准被实现。
主人规划过程已经确定现有的公园系统的力量和需要,
并且鉴定那些机会和限制条件与每相关新公园房地产在方面
整个系统的上下文。 与程序委员会和将军会晤
在计划编制和计划阶段的公开提供的继续的输入。
掌舵委员会由公园和娱乐咨询的董事会的成员组成和
来自公园和娱乐部门的代表。
两轮社区范围内的公园设计会议在2004年5月进行。
在五月初的开始车间关于公园的力量和需要恳求社区输入
系统和要被通过新站点的发展处理的问题。 一两天
车间,在本月允许公民评论并且对场所的分析作评论后期
以及对发展的机会和限制条件。 参加者鉴定并且给予优先权
每个公园的他们的视力的公园和初步计划概念的计划和熟练。

收起